January 2008.
My December goals didn't work out as well as I'd hoped.
December
1. Finish Ariel's sweater and send it to her before Christmas. - Not done. Will finish after I finish #3 below.
2. Finish Felted Clogs I started for mom in time for Christmas. DONE and well received.
3. Finish the sample knitting I'm working on. - Not done. Getting close though.
4. Finish the Little Child's Socks. - Not done. Was resigned to laundromat knitting and will probably take 1-2 more trips.
5. Go over my WIP list from the beginning of the year and decide what to frog. DONE See very bottom of post.
6. Finish getting my stash up on Ravelry. - Half Done. I photographed and cataloged one of the two main drawers of yarn. I have some stash reduction for sale here, if anyone's interested.
JANUARY
1. Finish sample knitting.
2. Finish and send Ariel her sweater.
3. Finish Red Socks and start new socks.
4. Finish Orange Sweater.
5. Get last of stash up on Ravelry.
2007 WIPs
Sweaters
- Rogue, needs one front shoulder, hood, and finishing work. Ripping, yarn for sale.
- Self designed Luxury Tweed sweater, most of a sleeve done. Ripping, yarn being reclaimed.
- Trellis Baby Sweater, needs a 2nd sleeve and most of a collar. Ripped
Lace
Tina Shawl, about 2/3 through center square. Progress made, 1/2 through 2nd edging chart.
Socks
- Norwegian Stockings, heel and foot to go on 2nd sock. Ripped
- VK Embroidered Stockings, top of calf shaping on 1st sock. Ripped, yarn swapped.
- Unst Socks, past gusset on 2nd sock. Finished
- Cabled Mitten Socks, 1st sock complete. Ripped
Accessories
- Fetching Fingerless Mitts, 1 thumb to go (this is embarrassing). Finished
- Aneomi Mittens, started ribbing for 2nd mitten. Ripping
- Nordic Mittens, started thumb gusset for 2nd mitten. Ripping
Blankets/Afghans
- Lizard Ridge, 3 squares completed. Abandoned. I might try and turn the squares I finished into pillows.
It's an awful lot of ripping, but really, that's fine by me. I'll get a current WIP list up at some point this month to refer back to in 2009. No long and languishing projects for me!
Comments
A lot of ripping, but now you have more yarn to play with! Best of luck your 2008 WIPs!
Posted by: Nonnahs | January 9, 2008 08:43 AM